Nikon SB-800 Speedlight Repaired

Posted on June 6th, 2009 by KhoKing.
Categories: Photography.

My technician repaired my faulty Nikon SB-800 speedlight. The LCD panel of my SB-800 is not functioning, no word being shown.

The SB-800 has been serving me for nearly 4 years, and I bought it used for less than RM800 4 years ago. The backlight on the LCD panel was not working during the day I bought it, I did not realize it until a later date, but still it serves nicely. Now after the back panel completely gone, it was time for replacement of the LCD panel, and it is nice to have the backlight on the LCD panel, as I have in some cases needed to check the flash setting at night that I can’t.

Good to see the LCD panel backlight:

kkk_2969.JPG

As usual, Lambency on my SB-800 99% of the time.

kkk_2967.JPG

For those who need flash repair services, can contact ShaShinKi at:

0 comments.

Happy Birthday to my Megumi!

Posted on June 6th, 2009 by KhoKing.
Categories: Family.

Next Saturday, 14th June 2009, is the 2 years old birthday of my Megumi.

Sadly, I can’t celebrate with her, as she is with her mother in Perak and I have lots of work this coming week and next week.

Went out to buy a present for my baby…

kkk_2961.JPG

What’s inside? Haha…I will let Megumi open it first before revealing.

Here’s a message for Megumi, she might not be able to read or understand now, but I hope she will read this blog when she grows up.

kkk_2963.JPG

May God protect her, guide her, lead her, save her. In Jesus Christ’s name I prayed, amen.

0 comments.

Cost of Built in Furniture?

Posted on June 6th, 2009 by KhoKing.
Categories: House Reno.

Today I asked a designer of a nearby furniture maker to come to my house to do some quotations of built in furniture cost of my house.

Basically below are what I plan to do:

  • Living Room TV Rack and Backdrop
  • Kitchen Sliding Door (my door is 4 feet, which is too heavy if using wood as according to the designer, so he suggested aluminum with glass.)
  • Kitchen U shape cupboard (up and down)
  • Master Bedroom Cupboard
  • Master Beedroom TV Rack + Backdrop
  • Master Bedroom Bed+Floor
  • 1st Room Upstairs Cupboard (I did ask roughly the cost, which is over RM3k for a sliding door type. Wah…expensive leh…can buy full set of bed + cupboard already and still some money left!)

Built in furniture is really expensive. My budget is not more than RM40k for the above, hopefully can do. Will get a quotation first before deciding (might cut here and there…most probably the last item).

1 comment.

Protected: House Renovation - 06 June 2009 (Saturday)

Posted on June 6th, 2009 by KhoKing.
Categories: House Reno.

This post is password protected. To view it please enter your password below:


Enter your password to view comments